HILTON PARK BOAT ACCESS FACILITY (DOVER, NH) TO BE CLOSED JANUARY 21 - MARCH 8, 2013 - Printable Version +- Fishing Forum (https://bigfishtackle.com/forum) +-- Forum: New Hampshire Fishing Forum (https://bigfishtackle.com/forum/forumdisplay.php?fid=371) +--- Forum: New Hampshire Fishing News (https://bigfishtackle.com/forum/forumdisplay.php?fid=287) +--- Thread: HILTON PARK BOAT ACCESS FACILITY (DOVER, NH) TO BE CLOSED JANUARY 21 - MARCH 8, 2013 (/showthread.php?tid=793967) |
HILTON PARK BOAT ACCESS FACILITY (DOVER, NH) TO BE CLOSED JANUARY 21 - MARCH 8, 2013 - FishNews - 01-23-2013 CONCORD, N.H. -- The New Hampshire Fish and Game Department today announced that the New Hampshire Department of Transportation (NHDOT) Hilton Park boat<br /> access facility on the Piscataqua River in Dover will be closed to the<br /> public from January 21 through March 8, 2013, because of construction<br /> activities related to installation of a natural gas pipeline. During this time, Granite State Gas Transmission, Inc. (GSGT), in<br /> coordination with the New Hampshire Department of Transportation (NHDOT),<br /> will conduct pre-construction and construction activities necessary for<br /> installation of a natural gas transmission pipeline under the Piscataqua<br /> River between Newington and Dover, N.H. Mobilization and pre-construction activities are scheduled to commence on<br /> January 21, 2013 on NHDOT property in Newington, on the easterly side of<br /> Spaulding Turnpike and south of Shattuck Way and on NHDOT property in the<br /> area of Hilton Park in Dover. Drilling activities are scheduled to commence<br /> on February 6, 2013. |