This from an email I received back from IPCO yesterday.
As of this morning, Idaho Power began a slow refill of Brownlee Reservoir. [#0078d7]At the current projected rate of refill, we estimate that Brownlee Reservoir will be at 2024 ft as early as the 11th of May. At 2024 ft Woodhead Park boat ramp becomes accessible.[/#0078d7] We hope to reach 2050 ft by the end of May which will make both Hewitt Park and Farewell Bend boat ramps accessible
[signature]
As of this morning, Idaho Power began a slow refill of Brownlee Reservoir. [#0078d7]At the current projected rate of refill, we estimate that Brownlee Reservoir will be at 2024 ft as early as the 11th of May. At 2024 ft Woodhead Park boat ramp becomes accessible.[/#0078d7] We hope to reach 2050 ft by the end of May which will make both Hewitt Park and Farewell Bend boat ramps accessible