07-08-2009, 07:36 PM
It is finished. All I need to do is give it a paint job. The railing and rod tubes are removable for storage and also to make it more convenient and adaptable. Also added a flag holder for a small orange flag for when I am on water with the power squadron so I don't get hit. Next on the list is to make a wheeled trolley for land movements, a tool rack, and figure out how to make foot rests. Yes, my toon didn't come with anything. All extras you had to pay for separately at the time.
[signature]
[signature]