Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Beta Testing New Stuff
#5
"How many of your attachments stay "permanently" on the tube? About how long does it take you to get setup and in the water? "

[cool][#0000ff]My "modular" rod holders and utility rack holders go on and off quickly and easily. But, they swing flat when not in use...or during transport if I am carrying my tube at least partially inflated. I disconnect the bulky stuff...like net holder, mirror attachment and on/off switch. If I need to fully deflate my tube...like when I am riding with another tuber...I disconnect all the PVC attachments and keep them in a small gym bag.[/#0000ff]
[#0000ff][/#0000ff]
[#0000ff]I estimate that it takes me only about 5 minutes longer to setup and take down my tube with the motor, battery and all the PVC on it. Maybe less. I am still right there with anybody else at launch time. But that's not saying much for some folks. [/#0000ff]
[#0000ff][/#0000ff]
[#0000ff]A lot of what I have been playing with is a system to make it faster and easier to get on the water...and pack for the return. If I load everything in the right sequence...coming and going...the whole process flows fairly smoothly.[/#0000ff]
[signature]
Reply


Messages In This Thread
Beta Testing New Stuff - by TubeDude - 09-01-2010, 07:57 PM
Re: [cpierce] Beta Testing New Stuff - by TubeDude - 09-01-2010, 10:30 PM

Forum Jump:


Users browsing this thread: 3 Guest(s)