08-08-2012, 02:53 AM
Okay, the Humminbird 110 arrived today, I measured everything and went to the local HD and bought a 3 in. X
2 in. Fernco rubber coupling , a 2 ft piece of 2 in. PVC pipe, a 90deg elbow foam insulation for 1in pipe to take up the slack and a package of 2 cam clamp straps 8 ft long. Tomorrow during the heat of the day I will be in the garage playing!
The reason I'm going with the rubber coupling is it will "grab" the plastic of the housing. I will post pictures when its finished.
[signature]
2 in. Fernco rubber coupling , a 2 ft piece of 2 in. PVC pipe, a 90deg elbow foam insulation for 1in pipe to take up the slack and a package of 2 cam clamp straps 8 ft long. Tomorrow during the heat of the day I will be in the garage playing!
The reason I'm going with the rubber coupling is it will "grab" the plastic of the housing. I will post pictures when its finished.
[signature]