Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Pimpin out my toon
#1
Well here is the 70% finished pimp for my toon. I have a rack with rod rack built in and added a motor mount to it. When completed It will have tubes for the rods and will be tied down with straps to the two bladders. I am still trying to see how high of a railing I want to build. You can see in one of the pictures that it is partially finished. The rack can hold up to 6 rods. After this is complete then I will work on a tool rack for the lip grippers, Pliers, and a folding net that I found made by Frabil.
[signature]
Reply


Messages In This Thread
Pimpin out my toon - by albinotrout - 07-07-2009, 04:40 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)